Technical Project Management #5: Why Small Requirements Win

December 04, 2025
Cover Image

Technical Project Management #5: Why Small Requirements Win

Watch the Video

Or watch it directly on YouTube: Click here

Video Description

Most teams' requirements are way too big, and it's causing problems they don't even realize. This video gives you seven distinct reasons why small requirements beat big ones — and how to know when something's small enough.

What you'll learn:

• The apple analogy: same work, manageable bites • Seven reasons small requirements win:

1. Don't choke (delivery risk)
2. Find out fast (feedback risk)
3. Flow faster (cycle time / Little's Law)
4. Stay flexible (adaptation)
5. Gifts for stakeholders (trust)
6. Wins for the team (motivation)
7. See trouble early (visibility)
   • When you find out you're in trouble: 3 weeks vs. 2-3 days
   • The objection flip: "What's the advantage of BIG requirements?"
   • How small is small enough? Four rules of thumb

Key insights:

• Big requirements hide risk; small requirements surface problems early • The cost of being wrong scales with how long you were wrong • Frequent completions trigger dopamine — starving teams of wins kills morale • Same work delivered weekly builds trust; same work delivered in 8 weeks erodes it • If your requirement is 3 weeks, you won't know you're in trouble until day 12 • Splitting is a skill worth developing

Previous Video: Technical Gibberish vs. Human-Readable Requirements Next Video: Features vs. Requirements vs. Things That Never End ► Full Playlist: https://www.youtube.com/playlist?list=PLGxFXI4dC2shCJwhTY-P2726zts26_AKF


Are your requirements too big? Hit that like button! Subscribe and enable notifications — we're building practical project management skills from the ground up.

Which of the seven reasons resonates most with your team? Let me know in the comments!


#ProjectManagement #TechnicalPM #Agile #Scrum #Kanban #LittlesLaw #CycleTime #WIP #ProductManagement #SoftwareDevelopment #Tutorial #TechLead #EngineeringManager

0:00 Why Small Requirements Win 0:36 The Apple Analogy 0:58 The Seven Reasons 1:42 Reason #1: Don't Choke 2:23 Reason #2: Find Out Fast 3:10 Reason #3: Flow Faster 3:46 Reason #4: Stay Flexible 4:23 Reason #5: Gifts for Stakeholders 5:02 Reason #6: Wins for the Team 5:48 Reason #7: See Trouble Early 6:39 When You Find Out You're in Trouble 7:02 The Complete Picture 7:30 The Objection Flip 8:11 How Small Is Small Enough? 8:56 Key Takeaways

Video Info

  • Duration: 10:02
  • Published: December 04, 2025

Links